We performed a test pre-assembly of the structure for the equipment for the production of foils: 154 tons of steel with a surface of almost 5000 m2. Everything is verified, so it can be dismantled, painted, packed and taken to the customer in Germany.

Date: September 2021
Category: Investment constructions
Destination country: Germany