We have carried out a pre-assembly of the gas turbine structure for GE. It was the pre-assembly check for a final functional and quality control before the surface treatment is carried out.

The total weight of the produced steel construction for one turbine is 35 t.

Date: April 2016

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Oversized machine packed in heat shrink wrap

Více

Vibrating conveyor chute

Více