We have finished a preassembly check of a gas turbine steel structure for General Electric, objects Exhaust and GT, designed for indoor.

Total volume: 70t

Date: May 2015
Category: Structures in power generation

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Another unit for the Algerian power plant

Více

Steel structure for power plant in Oman

Více