We have completed the inspection pre-assembly of the steel structure of the new design, which will be installed in the new technological center of our customer. The total height of the tower is over 17 m, the highest floor is located at a height of 15 m. The weight of the structure is 56 tons.

Delivery including engineering and surface treatment.

Date: May 2020
Category: Investment constructions
Destination country: Germany

What they say about us

“ We were very happy with the technical solution and the delivery of technological and supporting steel structures for the hydrogen production units by the company TMETAL. We are looking forward to continued cooperation. “

Petr Pazdera, ZVU Engineering a.s., Hradec Králové


TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více

Pre-assembly of the steel structure

Více