Manufacture of steel structure with hoppers for a sorting station.
Delivery including engineering and surface treatment, total weight: 48 tons.
Pre-assembly photoes in TMETAL.

Date: December 2017
Category: Investment constructions

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Steel structure for the foil production technologies

Více

Steel structure going to Brasil

Více