We are fabricating a triple tower for a blown film production line. Total weight of 160 tons.

Delivery including design, production, pre-assembly, surface treatment and packaging.

 

Pre-assembly photoes of one of the towers and overall model:

Date: October 2019
Category: Investment constructions
Destination country: Germany

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více

Pre-assembly of the steel structure

Více