Pre-assembly of the CO2 capture structure

Brevico7u

We performed a pre-assembly inspection of a steel structure in Brevik, Norway. This is a supporting structure for a facility for capturing, liquefying, and temporarily storing CO2 emitted during cement production.

Steel structure for power plant in Algeria

IMG 20210510 080343 scaled 1

We have manufactured a steel structure of compact wall sections for covering a gas turbine for GE. This is a new development, where the walls are prepared in production, including insulation, and only simple assembly of large-area segments is required on site. TMETAL did not want to stand aside from this possible future production trend, even though it is very space-, logistically and handling-intensive. We deliver with test pre-assembly and overseas packaging.

Design for a unique CO2 capture facility in Norway

Norcem Brevik

TMETAL has won a contract in Norway for the production of steel structures for the CO2 capture and storage facility at the Norcem cement plant in Brevik. Our company is involved in supplying steel structures for the compressor system (railings, stairs, ladders, walkways). We supply approximately 160 tons of steel structures including design and statics.

Balconies for the Vienna skyscraper the Marks

IMG 20210223 092449u

TMETAL is producing balcony panels for the Q-Tower in Vienna, which will be part of the Marks three-tower complex. It is a 114 m high building with 35 floors, being built by Porr and will offer around 390 apartments in addition to commercial and recreational areas. It is scheduled to be completed together with the other two Marks towers in early 2023.

Fryčovice has a new footbridge from TMETAL

IMG 20201019 101748u

Our team of installers installed a new footbridge over the Ondřejnice River in Fryčovice. This nine-ton steel footbridge, 28 m long, was designed and manufactured by TMETAL according to the municipality's requirements. We are pleased that we could contribute to local development.