After a longer time, we again produced a diffuser for the simulation of free fall. It will be installed in skydiving arena in Germany.

Delivery including construction work and surface protection. Weight about 4 tons. Photoes from production in black.

Date: April 2021
Category: Buildings for industry and civic amenities
Destination country: Germany

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Steel construction for indoor skydiving in Poland

Více

Steel Structure Expansion for Coll Fashion’s Storage Facilities

Více