Within one night Vienna received a new symbol. A pedestrian bridge was installed at Vienna Schwechat Airport over the night from 9th to 10th February 2020. The steel structure of the bridge comes from TMETAL workshop. The bridge consists of two 34- and 58-meter-long sections and connects Parkhaus 3 and the new Office Park 4, which will be opened together with the bridge in May 2020. The bridge will be roofed and will be fitted with a giant 180 m2 LED wall.

TMETAL supplied steel structures of both bridges together with engineering and surface treatment.

The weight of the bridges is 49 tons and 83 tons.

Date: February 2020
Category: Buildings for industry and civic amenities
Destination country: Austria

What they say about us

“ We were very happy with the technical solution and the delivery of technological and supporting steel structures for the hydrogen production units by the company TMETAL. We are looking forward to continued cooperation. “

Petr Pazdera, ZVU Engineering a.s., Hradec Králové


Steel construction for indoor skydiving in Poland

Více

Steel Structure Expansion for Coll Fashion’s Storage Facilities

Více