TMETAL produces another steel structure for a vertical conveyor designed to transport excavated material from the tunnel to the surface by a vertical lift.

Total weight of delivered structure: 40 t

Pre-assembly photo in TMETAL, conveyor head and foot.

Date: May 2019
Category: Investment constructions
Destination country: United Kingdom

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více

Pre-assembly of the steel structure

Více