We have completed the pre-assembly of the support structure for belt conveyor drive. It is designed to transport excavated soil during construction in Copenhagen. Delivery including engineering and statics.

Weight of structure: 37 tons

Date: December 2019
Category: Investment constructions
Destination country: Denmark

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Installation of a steel structure in Germany

Více

Steel structure for the construction of a nuclear power plant in the UK

Více