Production of steel construction for 3M, supply including engineering, surface treatment. Total weight: 115 tons.

Photoes from the preassembly at TMETAL and from assembly in Poland.

Date: January 2018
Category: Investment constructions
Destination country: Poland

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Steel structure for the foil production technologies

Více

Steel structure going to Brasil

Více