Everything has to fit, one tower travels all the way to Australia. Each of the towers has about 40 tons, we supply including engineering, surface protection and packaging.

Date: May 2022
Category: Investment constructions
Destination country: Australia

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Steel structure going to Brasil

Více

Steel construction for a large-scale CO2 capture plant in Norway

Více