We supply another steel tower for the technology of film production and unwinding.

Delivery including engineering, surface treatment and packaging.

Total weight: 42 tons

Date: March 2019
Category: Investment constructions

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více

Pre-assembly of the steel structure

Více