Fryčovice has a new footbridge from TMETAL’s workshop
Our installation team installed a new footbridge over the Ondřejnice River in Fryčovice. This nine-ton steel footbridge, 28 m long, was designed and manufactured at TMETAL according to the municipality’s requirements. We are pleased that we could contribute to local development.
Tagged Case studies