Conveyor for the construction of the Paris metro

March 2018

Steel Structures

France

Engineering and manufacturing of the steel structure of the Snake “S” conveyor for transporting rubble during tunnel drilling for the new metro line in Paris. This conveyor is unique in that it takes in the material in the horizontal part, holds it compressed by belts while moving along the vertical part and releases it again at the top at the horizontal level. We delivered a total of two conveyors, each weighing 23 tons.

Total project weight: 46 tons.

Delivery including engineering and surface treatment.