Pre-assembly of a giant structure

Září 2021

Steel Structures

Germany

We have carried out a trial pre-assembly of the structure for the foil production facility: 154 tons of steel with a surface area of ​​approximately 5000 m2. Everything has been verified so that it can be dismantled, painted, packed and transported to the customer.

Do you need help with the preparation or implementation of your project?

Do not hesitate to contact us!

We can help you with design, production and assembly. Contact us today.