Winter pre-assembly of a steel structure for foil production

February 2021

Steel Structures

Despite the freezing and snowy weather, our installers managed to complete the pre-assembly of the steel structure of the tower for the foil production technology. After acceptance, it will be dismantled, painted, packaged and shipped to the port in Germany and then to the factory in Nigeria.

Total weight of the structure: 46 tons

Do you need help with the preparation or implementation of your project?

Do not hesitate to contact us!

We can help you with design, production and assembly. Contact us today.